China’s first privately owned enterprise in Jiangsu Province specializing in power engineering construction!
Project Performance
| Recent Performance Summary Table | |||||
| Serial number | Voltage Level/Installed Capacity | Project Name | Project Summary | Project Location | Contract amount |
| One | Overhead Line Project (Crossing High-Speed Rail) | ||||
| 1 | 500KV | Construction of the erection frame for the relocation and reconstruction project of the 500kV Taixu Line 5923/Taihang Line 5933, spanning the Tonghu Railway and the Shanghai–Nanjing Along-the-River High-Speed Railway, section 55#–80#. | Key milestones: the Tonghu Railway, the Shanghai–Nanjing Along-the-River High-Speed Railway, the Yanglintang Navigation Channel, and the Shanghai–Yixing Expressway. | Taicang, Suzhou | 13.56407227 million yuan |
| 2 | 220KV | Construction of the erection frame for the 220kV Shouqun 2L24 Line, spans 19#–27#, and the Xin Qian 2L86 Line, spans 58#–66#, as part of the relocation and crossing project over the Shanghai–Nanjing Yangtze River High-Speed Railway. | Key milestone: the Shanghai–Nanjing Yangtze River High-Speed Railway (South Yangtze River High-Speed Railway), an electrified high-speed line with a design speed of 350 km/h. | Taicang, Suzhou | 7,674,955.96 yuan |
| Two | Cable Engineering (China’s first superconducting cable and a cross-river project) | ||||
| 1 | 10kV | Shenzhen Power Supply Bureau Co., Ltd. 10kV Binhe–Xinghe Superconducting Cable Demonstration Project | The project serves critical loads, including the Ping An Financial Center. Media report: “China’s first 10 kV three-phase coaxial high‑temperature AC superconducting cable has been successfully laid in Shenzhen,” as reported by Phoenix News; the associated construction technology has been granted a national patent. | Shenzhen Futian Central District (connecting the 220 kV Binhe Substation and the 110 kV Xinghe Substation) | RMB 3,804,569.00 |
| 2 | 10kV | Zhenjiang Jiangxinzhou Cross-River Cable Project | Utilizing automated conveying technology (patented equipment), the cable was successfully pulled in a single pass, with a pulling force of 12 tons. Media coverage: Nantong Net, “A Unique Innovation by a Nantong Enterprise: Automatic Cable Crossing of the Yangtze River, Achieved in One Go.” | Jianbi Town, Jingkou District, Zhenjiang City → Jiangxinzhou (Yangtze River) | 10 million yuan |
| Three | Substation and Distribution Engineering | ||||
| 1 | 10kV | Xilingol Power Supply Company’s 2024 Distribution Network Construction and Renovation Project | Covering all banners, counties, herder settlements, agricultural and pastoral areas, as well as aging urban districts in the Xilingol League, this initiative is aligned with the goals of rural revitalization, upgrading electricity supply in pastoral regions, and integrating new energy sources into the grid. | Xilingol, Inner Mongolia | RMB 4,405,283.00 |
| 2 | 10kV | 10 kV Distribution Transformer Project for the 80,000-ton Grain Storage Facility (County Central Grain Depot) Project | The project provides a reliable, dedicated power supply for the grain storage buildings—including single-story granaries and shallow cylindrical silos—along with the drying workshop, ventilation and cooling system, fumigation equipment, fire pump room, office and living quarters, and the intelligent grain‑condition monitoring system. | Rudong, Jiangsu | 126.677912 ten thousand yuan |
| 3 | 10kV | Procurement and Installation of the Power Distribution and Substation System for Phase II of the AVIC Lithium Battery Hefei Project | The project ensures a safe and stable power supply for the power‑battery base, supports Hefei’s new‑energy industry chain and its development as the “Capital of New‑Energy Vehicles,” and boosts the capacity utilization and market competitiveness of CALB, thereby driving upgrades to the region’s power infrastructure. | Hefei Changfeng | 109,753,610.5 ten thousand yuan |
| Four | Photovoltaic project | ||||
| 1 | 80MWp | PC General Contracting for the Photovoltaic Park of the China Resources New Energy Nantong Nanmo 80 MWp Fishery–Photovoltaic Complementary Project | The project generates approximately 97.6 million kWh of electricity annually, providing clean power to the local community and contributing to the achievement of the “dual carbon” goals. | Hai’an, Jiangsu | 7.07505735 million yuan |
| 2 | 300MW | Labor Services for the Huaneng Guanxi Salt Farm 300 MW Fishery–Photovoltaic Complementary Salt Culture Green Energy Project | The project generates nearly 400 million kWh of electricity annually, contributing to the development of local green energy and the upgrading of the salt‑production industry. | Ganyun, Jiangsu | RMB 1,405,480 |
| 3 | 100MW | Construction of the Huaneng Jinxiang Mamiao 100 MW Agri‑Photovoltaic Complementary Power Station Project (Phase I) | The project generates approximately 60 million kWh of electricity annually, providing clean power to the local community and supporting rural revitalization as well as the achievement of the dual carbon goals. | Jinxiang, Shandong | RMB 34.97540359 million |
| Five | Wind power project | ||||
| 1 | 200MW | Qinhuangdao Lankai New Energy Changli County 200 MW Wind Power Generation Project | The project generates approximately 500 million kWh of electricity annually, exclusively supplying power to Hongxing Steel’s production processes. It saves 120,000 tonnes of standard coal and reduces carbon dioxide emissions by 360,000 tonnes per year, supporting the enterprise’s green and low-carbon transformation and the optimization of the local energy mix. | Changli, Hebei | 17.8 million yuan |
| Six | Electrical Testing/Preventive Testing Work | ||||
| 1 | 10kV | Preventive Testing of Dedicated Transformers at Zhongyang Public Transportation Co., Ltd., Yangzhong City | The project effectively mitigates the risks of equipment failure and power outages, ensuring the safe and stable supply of electricity to the public transit system and supporting the enterprise’s safe production and compliant operations. | Yangzhong, Jiangsu | RMB 82,650.00 |
| Seven | Communication Optical Cable / Specialized Subcontracting Project | ||||
| 1 | 10kV | Jiangzhou Electric’s 2026–2027 Framework for Specialized Subcontracting in the Communication Optical Cable Business | Support the construction of optical cable networks for power‑grid communications, municipal low‑voltage systems, campus informationization, and photovoltaic and wind‑power integration, ensuring the reliable operation of grid‑dispatch communication and public‑service information infrastructure. | Yangzhong, Jiangsu | As determined by the subcontract agreement. |